# How a Betapawa solar installation works, step by step

By musa-danjuma, Betapawa · Published 2026-02-11 · Updated 2026-09-02

**Short answer:** A Betapawa-certified engineer surveys your site, confirms the design, then installs in one or two days: panels and rails, DC cabling and protection, inverter and batteries, earthing, then commissioning tests. You get a handover pack with photos, settings and registered warranties.

## Before install day

Clear access to the roof and the room where the inverter will sit. Make sure someone can let the crew in from 8am.

## On the day

Most home systems take one day. Larger systems or ones with long cable runs take two. Expect power to be off for 1–2 hours while we connect to your distribution board.

## After handover

Your warranties are registered against serial numbers, which you can check on our verify page. Your account shows your handover pack and lets you open a service ticket.

## Frequently asked questions

### Do you install on aluminium roofing sheets?

Yes. We use roof hooks or clamp systems rated for long-span aluminium and seal every penetration.


---
Source: https://www.betapawa.com/learn/how-solar-installation-works · Betapawa, 155B Dopemu Road, Agege, Lagos, Nigeria · 0803 491 2888 · Prices in Nigerian naira (NGN).