Schools · Ibadan, Oyo · completed January 2026
An Ibadan school runs its computer lab and classrooms on solar
- Fuel reduction
- 84%
- Monthly saving
- ₦920k
- Payback
- 21 months
- Lessons lost to outages
- 0
The problem
The school spent ₦1.1m a month on petrol and diesel, and lessons stopped whenever the generator failed.
The system
- 30kWp rooftop PV across three blocks
- 3 × 10kVA hybrid inverters
- 61kWh lithium storage
- Boarding-house lighting circuit
Measured results
Results measured over the first 6 months against a 3-month pre-installation baseline, following IPMVP Option B, by Crestgreen's M&V team.
“The lab hasn't gone off once this term. Parents noticed.”
Install photos will be published here with the client's permission.