Schools · Ibadan, Oyo · completed January 2026

An Ibadan school runs its computer lab and classrooms on solar

Fuel reduction
84%
Monthly saving
₦920k
Payback
21 months
Lessons lost to outages
0

The problem

The school spent ₦1.1m a month on petrol and diesel, and lessons stopped whenever the generator failed.

The system

  • 30kWp rooftop PV across three blocks
  • 3 × 10kVA hybrid inverters
  • 61kWh lithium storage
  • Boarding-house lighting circuit

Measured results

Results measured over the first 6 months against a 3-month pre-installation baseline, following IPMVP Option B, by Crestgreen's M&V team.

“The lab hasn't gone off once this term. Parents noticed.”
— Proprietress, A private secondary school