Installed properly, the first time
Every Betapawa system is installed or supervised by a Crestgreen-certified engineer, tested against a commissioning checklist, and handed over with photos, settings and registered warranties.
Fixed installation prices
Shown at checkout and included in package prices. Covers mounting, cabling within 20m, protection, earthing, commissioning and a 12-month workmanship warranty.
| System size | Lagos, Ogun, FCT | Other South West, South South, South East | North Central and North West | North East |
|---|---|---|---|---|
| Up to 1.5kVA | ₦45,000 | ₦50,000 | ₦54,000 | ₦59,000 |
| 2.5–3.5kVA | ₦75,000 | ₦83,000 | ₦90,000 | ₦98,000 |
| 5–6kVA | ₦120,000 | ₦132,000 | ₦144,000 | ₦156,000 |
| 8–10kVA | ₦220,000 | ₦242,000 | ₦264,000 | ₦286,000 |
| 12–20kW | ₦380,000 | ₦418,000 | ₦456,000 | ₦494,000 |
How it works
- 1
Site survey
An engineer checks your roof, existing wiring, distribution board and where the inverter and batteries will sit.
- 2
Design sign-off
You confirm the system design, cable routes and install date.
- 3
Mounting and panels
Rails are fixed to rafters, panels clamped and strings wired with MC4 connectors.
- 4
Inverter, batteries and protection
The inverter and batteries are mounted, with DC breakers, surge protection and a changeover.
- 5
Earthing and commissioning
An earth rod is installed and the engineer records PV voltage, battery state of charge and inverter settings.
- 6
Handover
You sign on the engineer's phone and get a handover pack with photos, settings and warranty registrations.
You pick your survey date at checkout from the installer's available slots in your state. Read the full guide
Our installers
Crestgreen trains, certifies and audits every installer. Ratings come from customers after handover.
- Certified
Segun Okafor
Crestgreen Energy (Lagos Mainland)
4.9/5 · 412 installs · since 2017
Covers Lagos, Ogun
- Certified
Bisi Lawal
Crestgreen Energy (Lagos Island)
4.8/5 · 336 installs · since 2018
Covers Lagos
- Certified
Musa Danjuma
Crestgreen Energy (Abuja)
4.9/5 · 288 installs · since 2016
Covers FCT, Nasarawa, Niger, Kaduna
- Certified
Kunle Adebayo
SunPath Installers, Ibadan
4.7/5 · 174 installs · since 2019
Covers Oyo, Osun, Ogun, Kwara
- Certified
Ifeanyi Eze
Eastline Power, Enugu
4.8/5 · 151 installs · since 2019
Covers Enugu, Anambra, Ebonyi, Imo, Abia
- Certified
Ebiere Tamuno
Delta Sun Works, Port Harcourt
4.6/5 · 133 installs · since 2020
Covers Rivers, Bayelsa, Akwa Ibom, Cross River, Delta
- Certified
Aminu Garba
Sahel Solar, Kano
4.7/5 · 121 installs · since 2020
Covers Kano, Jigawa, Katsina, Kaduna, Bauchi
- Certified
Osas Igbinedion
Midwest Solar, Benin City
4.6/5 · 98 installs · since 2021
Covers Edo, Delta, Ondo, Ekiti, Kogi
- In training
Danladi Pam
Plateau Power Co, Jos
4.4/5 · 57 installs · since 2022
Covers Plateau, Benue, Gombe, Taraba, Adamawa