Factories and industryIbadan, OyoJune 2026
Powering Hatchery Operations through Solar
Optimized via a rooftop configuration to maximize daily solar irradiation and footprint efficiency. Integrated a 80kW inverter setup and a 160kWh lithium-ion energy storage system to handle heavy industrial spikes.

“This was the best installation I have ever seen. Very clean and neat.”
More projects in Oyo
See all
Factories and industryIbadan, Oyo · September 2026
Hybrid Solar Power for Gbagi Gas Plant
We deployed a 3--Phase 32kW inverter system paired with 36 high-efficiency 650W panels and 96kWh of battery storage for continuous operations.
- 32kVA
- 96kWh
- 23.4kWp
Factories and industryIbadan, Oyo · September 2026
Zero-Downtime Solar Power for Odo-Oba Gas Plant
Engineered to eliminate production disruptions caused by grid instability. Features a robust 32kW inverter system paired with 36 high-efficiency 650W panels and 96kWh of battery storage for continuous operations.
- 32kVA
- 96kWh
- 23.4kWp
Factories and industryIbadan, Oyo · September 2026
Continuous Operational Power for Apete Gas Plant
Optimized via a rooftop configuration to maximize daily solar irradiation and footprint efficiency. Integrated a 32kW inverter setup and a 96kWh lithium-ion energy storage system to handle heavy industrial spikes.
- 32kVA
- 96kWh
- 23.4kWp