Hospitals and clinics · Garki, Abuja · completed March 2026

An Abuja clinic protects theatre and cold chain with solar storage

Changeover gaps
0
Diesel reduction
63%
Monthly saving
₦2.7m
Payback
29 months

The problem

Changeover gaps of 10–30 seconds were tripping theatre equipment, and the clinic spent ₦4.3m a month on diesel.

The system

  • 64kWp rooftop PV
  • 60kW three-phase hybrid inverters
  • 150kWh lithium storage
  • Dedicated critical-load panel for theatre and vaccine fridges

Measured results

Results measured over the first 6 months against a 3-month pre-installation baseline, following IPMVP Option B, by Crestgreen's M&V team.

“Zero-second transfer was the requirement. Crestgreen designed for it and proved it on test day.”
— Medical Director, A specialist clinic