Skip to content
betapawa

Solar for hospitals and clinics

Never lose power in theatre or the vaccine fridge

What we hear from hospitals and clinics operators

  • Life-critical loads can't wait for a changeover
  • Vaccine cold chain must hold 2–8°C
  • Diesel is the largest non-staff cost

Typical system

Online UPS-grade hybrid systems with critical-load panels and 24-hour storage.

Savings example

Diesel today
₦6,200,000/mo
With solar + storage
₦2,100,000/mo
Payback
30 months

Illustrative for a typical site. Your audit models your own load and tariff.

Case study: An Abuja clinic protects theatre and cold chain with solar storage

“Zero-second transfer was the requirement. Crestgreen designed for it and proved it on test day.” — Medical Director

Read the case study

Smaller site? Ready-made packages

3.5kVA

Pharmacies and clinics

Pharmacy 3.5kVA

Keeps vaccines and insulin cold 24/7

3.5kVA5.12kWh2.2kWp~14h backup
₦2,989,000

or ₦130,293/month

Installed price, inc. hardware and installation